THE PASSAGEWAY
       
     
 Existing conditions prior to redesign.
       
     
170811_Axon_LE.jpg
       
     
20190613_105040-2.jpg
       
     
Passageway-4.jpg
       
     
20190416_112352-2.jpg
       
     
20190613_105134-2.jpg
       
     
20190613_105530-2.jpg
       
     
THE PASSAGEWAY
       
     
THE PASSAGEWAY

LOCATION :: WINSTON-SALEM, NC

TYPE :: PUBLIC

COLLABORATORS :: ROOTS FIRST DESIGN, ROBINSON DESIGN ENGINEERING

The Passageway project offered a unique opportunity to collaborate with the Downtown Winston Salem Partnership and the City of Winston Salem to redevelop and improve an underutilized and unsafe mid-block pedestrian corridor that connects two vibrant downtown streets. As a remnant from a 1970s urban walking street, the bones of this project with board-formed concrete and brick paving required an update to address stormwater challenges, deteriorating pavement, and safety. With a very limited budget from a combination of private and public funds, these challenges were addressed with a “lighter, quicker, cheaper” design response that orchestrated the careful and selective removal of brick pavement to allow for new ecological planting, promotion of more diversity, fixing stormwater infrastructure, adding lighting for safety, and signage for wayfinding. The space is now a much more vibrant and activated pedestrian corridor that also hosts community events.

 Existing conditions prior to redesign.
       
     

Existing conditions prior to redesign.

170811_Axon_LE.jpg
       
     
20190613_105040-2.jpg
       
     
Passageway-4.jpg
       
     
20190416_112352-2.jpg
       
     
20190613_105134-2.jpg
       
     
20190613_105530-2.jpg